Water Bound Macadam using Brick Aggregate Base Course

WBMBC: Providing compacted brick aggregate base course, including supplying, spreading and compacting 50mm downgraded crusher run 1st class and Picked brick chips (LAA value not exceeding 40%) including supplying of required amount of 12mm downgraded chips made of same quality bricks, including spreading uniformly in layers of specified loose thickness on road surface maintaining grade, camber and super elevation including local handling, hand packing, booming, watering, dry rolling followed by wet rolling in layers with 8~10 tonne road roller to attain each layer's minimum soaked CBR 80% or Design CBR at specified degree of compaction, including supplying choking/screening material as filler material @0.018cum/sqm or as required including cost of materials, labours etc. all complete as per direction of the E-I-C. After adequate dry rolling spreading of choking/screening material on the surface, sprinkling water and rolling is to be continued until all the voids are filled, wave of grout/slurry flushes ahead of the roller. Thickness of each layer should not be more than 100mm loose and measurement for Payment will be made on compacted thickness. Degree of Compaction: Minimum 98% of MDD (Modified Proctor)

Comments